Public Water Transport System – Stage 2
Dubai, UAE
OTC developed concept designs for 6 water transport terminals to be built along the Dubai Creek, comprising Phase 2 of the development of water transport terminals in Dubai.
Using the modular planning approach developed by OTC in the Dubai Marine Transportation Master Plan, site and terminal plans were developed for three development phases, including planning of intermodal connections to ground transportation as well as integration within the existing and planned urban context.
City: | Dubai, United Arab Emiratates (UAE) |
Year: | 2009-2010 |
Services: | |
Modes: | |
Client: | Parsons Brinkerhoff / Dubai Roads and Transport Authority (RTA) | Collaborators: | BMT |